← ALL EXAMPLE TOOLS

TOOL-08 · EXAMPLE TOOL

Quote Builder

Every quote starts the same way: find a similar old job, copy it, adjust the prices, and hope the material costs are still right. Quote Builder turns your pricing rules into a form that gives the same answer no matter who fills it in.

EXAMPLEAn example of the kind of tool I build. Yours is designed around your own rules and data.

FIG. 1

How it works

EXAMPLE DATA

JOB DETAILS

  • Q-2207bracket · 40 units · powder coat
  • Q-2208custom enclosure · 1 unit
  • Q-2209repeat order · rev B drawing

PRICING — Q-2207

  • material at current rateOK
  • labour from standard timesOK
  • finish surcharge appliedOK
  • margin above minimumOK
  • verdictREADY TO SEND

YOUR RATES, YOUR MINIMUMS, YOUR MARGINS

QUOTES

  • READY TO SENDQ-2207
  • ONE-OFF — YOU SET LABOURQ-2208
  • REPEAT AT LAST PRICE?Q-2209

YOU APPROVE EVERY QUOTE BEFORE IT GOES OUT.

SPEC SHEET

DOES
Builds an itemized quote from job details using your price list and pricing rules.
INPUTS
Job type, quantities and options; your rate sheet.
AI SCOPE
Optional. Pulling job details out of a customer's email or drawing notes.
FAILS
Safe. Anything outside your rules is flagged for you to price.
OWNER
You, at handover. Full source and docs.

EXAMPLE SCENARIO

A small fabrication shop where the owner writes every quote after hours

BEFORE

  • Quotes built by copying an old one and editing it
  • Material prices that are a few months out of date
  • Two people, two different prices for the same job

AFTER

  • Pick the job type, enter quantities, get an itemized quote
  • Material and labour rates come from one price list you control
  • Margins and minimums checked before anything goes out

SIGNS YOU NEED THIS

  • Only the owner can price a job properly
  • You've lost money on a job because a cost was missed
  • Quotes go out days after the request
  • Customers ask why two similar quotes differ

USEFUL FOR

  • Contractors & trades
  • Fabrication & machine shops
  • Print & signage
  • Events & catering

START HERE

Sound like your week?

The audit is free: 45 minutes, one workflow walked end to end, and a written map of it either way.